Home Insights Articles How to extend CI pipelines with continuous performance testing

How to extend CI pipelines with continuous performance testing

Complex industrial piping system in a facility

In previous posts we’ve talked about why  Continuous Performance Testing (CPT) must be an integral part of managing the user experience. We’ve also discussed some of the reasons CPT is hard to implement. Now it’s time to get into the nitty-gritty of making CPT part of your CI pipeline. As you will quickly discover, this isn’t rocket science once you understand the goals and the process.
The standard pipeline for application development can be logically split into two main sections:

 1.  A continuous CI loop that starts with every commit and progressively applied to most stable builds, and
 2. Release-level testing and sign-off, which is executed against the release candidate before it is about to go into production.

Continuous CI LoopOne-Time Release Sign-off

Continuous Integration Pipeline and One-Time Release Performance Sign-off

A pre-release sign-off test happens infrequently and is heavily manual in nature. It involves deployment of a full test environment that typically includes various end-to-end (E2E) user scenarios combined with load, stress, and stability testing. This is a highly skilled job performed by the application engineers and is both explorative and experimental in nature; they must set up the environment, configure tools to measure performance and utilization elements, run tests, measure results, analyze the findings, modify scenarios, adjust the infrastructure, reconfigure their tools, and try again. 

Any performance issues found at this stage result in a tough dilemma for the release management team: Should they let the release through with known performance issues, or send the release back to engineering and miss the ship date?

Both options are far from ideal. It’s far more efficient to evaluate the performance characteristics of each build during active development, at the same time other quality issues are discovered and corrected. Getting this done right — cost-effectively and automatically — is the central idea behind CPT. 

This can be done by taking  performance testing functions that can be automated and moving them into the CI pipeline, like this:

CI LoopRelease Process

Continuous Integration Pipeline with Performance Testing steps
Continuous Delivery Blueprint by Max Martynov and Krill Evstigneev

Effectively, we apply the principles of multi-stage regression test pipelines to performance testing. This is typically done by creating a series of rather simple tests that check different aspects of the system against performance objectives in a selected set of scenarios, and inserting these tests into appropriate phases of the CI pipeline as shown above.

While not all types of performance testing can be reduced to the types of tests suitable for CI pipelines, here are a few common ones that can: 

  • Performance smoke testing: Applied to an isolated service via an API in a representative configuration, this test measures the response times of certain critical performance-sensitive operations — for example search queries, data exports or product updates. The environment configuration, test data, and operations are simplified to produce a quick, cheap, and effective pass/fail test that captures gross performance trends with respect to common performance-sensitive operations for each build. Simplicity and fast response times allow us to put these tests in the category of smoke tests.
  • Performance regression testing: These tests measure simulated performance characteristics of typical user scenarios, such as placing item in a shopping bag, placing a product order, browsing a catalog and so on. These tests are performed exclusively via APIs and exclude any UI operations. They aim to measure the effective performance characteristics of common business workflows and expose bottlenecks due to poor design or implementation. We implement user scenarios executing sequential API calls, and collect metrics for each scenario and each API call. We focus primarily on the performance of each step. Eliminating UI-related operations from the regression testing reduces the number of tests that need to be written, simplifies test maintenance between releases, and shortens test execution times.
  • End-to-end (E2E) performance testing: Full user scenarios, including UI, backend, and all required external 3rd party services, configured in production-like environments with realistic data volumes. These are long-running, relatively “expensive” tests designed to realistically measure the user experience.

All three types of tests lend themselves well to integration with different stages of the existing CI pipeline: performance smoke tests extend existing functional smoke tests; performance regression testing supplements other forms of regression testing; and performance E2E tests are best run side by side with integration testing. 

In our next post, we’ll dive deeper into the specifics of successfully extending existing CI pipelines with Continuous Performance Testing.

Authors

Tags

You might also like

AI figure with cascading billing data to represent LLM cost optimization
Article
Your AI bill is rising. How do you direct every dollar to business value?
Article Your AI bill is rising. How do you direct every dollar to business value?

You can wait for vendors to make token economics more transparent or act now to understand your AI costs, reduce waste, keep innovating, and direct more of your budget toward measurable business value. The choice is yours. Because you chose to act now. This discussion helps you measure the p...

Stylized orange robot wearing a translucent suit and working on a laptop, representing AI agents powering modern test automation.
Article
How AI agents took automated test coverage from 20% to 80% in just 6 weeks
Article How AI agents took automated test coverage from 20% to 80% in just 6 weeks

In just six weeks, our QA experts at Grid Dynamics helped a client team turn limited test automation into a quality gate enforced on every merge. Coverage grew from roughly 20% to 80% across a modern release stack, without expanding the QA team. Two QA engineers directed the AI agents, reviewed...

Translucent UI wireframes with red highlights representing experience debt
Article
Experience debt is the bill AI passes to your customers
Article Experience debt is the bill AI passes to your customers

Technical debt slows your developers. Experience debt drives your customers away. Most companies understand the first half of that sentence far better than the second. Technical debt has a language executives accept, dashboards that track it, and ratios that price it. It has earned its seat on t...

Abstract illustration of a person at a laptop surrounded by colorful overlapping rectangles and blocks illustrating practical techniques for agent evaluation.
Article
Practical agent evaluation techniques for a real-world knowledge assistant: A Grid Dynamics case study
Article Practical agent evaluation techniques for a real-world knowledge assistant: A Grid Dynamics case study

With the rapid growth of AI agent usage in production, Grid Dynamics began facing challenges in determining whether agents were healthy, identifying abnormal behavior, and understanding when agent behavior deviated from expected outcomes. This article provides an actionable approach to building eval...

Exploding agent head with knowledge and user interfaces to represent adaptive UI validation
Article
AI agents are assembling adaptive UI. Here’s how validation needs to evolve.
Article AI agents are assembling adaptive UI. Here’s how validation needs to evolve.

User interfaces are no longer static. The industry is shifting toward adaptive systems where the interface is assembled at runtime. For decades, software was designed around fixed surfaces: a nav here, a hero there, content slots predefined by a designer. Users learned the interface. However, th...

Surreal portrait of a woman with headphones amid data and cloud motifs, illustrating AI-powered modernization.
Article
Enterprise AI modernization as a daily operating model
Article Enterprise AI modernization as a daily operating model

What does AI-powered modernization as a daily operating model look like? On Monday morning, your teams do not start by opening an incident queue. They start by reviewing a set of pull requests produced overnight by software agents focused on modernization. Each pull request is small.

EU AI Act compliance checklist with abstract red and blue background
Article
Are your UI application development processes compliant with the EU AI Act?
Article Are your UI application development processes compliant with the EU AI Act?

As of February 2026, the European Union Artificial Intelligence Act (AI Act) has transitioned from a legislative draft to the primary regulatory framework for software engineering in the EU. This landmark legislation is no longer a distant prospect; with prohibitions on unacceptable risks already i...

Let's talk

    Up to 5 files, 10 MB each
    PDF, DOC, XLS, CSV, TXT, JPG, PNG, WEBP
    By sharing, I consent to the use or processing of my personal information by Grid Dynamics for the purpose of fulfilling this request and in accordance with Grid Dynamics’s Privacy Policy. For more details about how to opt-out, please refer to the Privacy Policy and Terms & Conditions.
    Submitting

    Industry Recognition

    MACH, Agent Ready 2026 Award

    2026

    MACH Alliance Awards, Best Retail Project

    2024, 2025

    AutoZone, IT Supplier of the Year

    2025, 2026

    Sysco, Technology Partner of the Year

    2026
    Abstract glass goblet sculpture

    Thank you!

    It is very important to be in touch with you.
    We will get back to you soon. Have a great day!

    check

    Thank you for reaching out!

    We value your time and our team will be in touch soon.

    check

    Something went wrong...

    There are possible difficulties with connection or other issues.
    Please try again after some time.

    Retry